DS0205 - Stockage, gestion et intégration dans les réseaux des énergies

Components Control Communication for DC microgrid – C3µ

Submission summary

This project proposes an architecture of a meshed DC microgrid for delivery of electrical energy in tertiary or residential building, with a central management system in a first time to distribute needs and to associate in a most effective way an intermittent renewable source of energy. It will specifically result in capacity of adaptation of the source level by the search for the most adequate topology according to the ranges of tension of loads and the level of the distribution DC bus. The originality stands in the definition of two types of nodes (the smart DC plug and the smart node) in order to manage the network in a mode of partial energy decrease or reconfiguration.
Project is composed into five scientific tasks :
- task 1 : Design and realization of the elementary DC smart plug component which provides the power to the final DC loads and the smart nodes that manages the power exchanges on the DC bus (power electronic),
- task 2 : consumption measure, transmission and data processing for exchange between the smart plug and the smart nodes and the central management system,
- task 3 development of a test platform integrating the different nodes developped (smart nodes and smart plug),
- task 4 design of protocol and communication electronics for grid, PLC communication,
- task 5 modelling energy management and reliability of DCgrid; simulation to estimate gains of DC microgrid solution.
and one additional task for the project management.
The ultimate goal is to be able in the future to remove the central management system to integrate all of the intelligence in the nodes.


Project coordination

nicolas siauve (Laboratoire AMPERE)

The author of this summary is the project coordinator, who is responsible for the content of this summary. The ANR declines any responsibility as for its contents.

Partner

AMPERE Laboratoire AMPERE
LCIS Laboratoire de Conception et d'Intégration des Systèmes

Help of the ANR 440,128 euros
Beginning and duration of the scientific project: February 2016 - 42 Months